Cooling Tower - Installation - Repairs - Refurbishment - Servicing

Our Services

Be assured that you are receiving the best possible service from Australia's leading Cooling Tower and Mechanical services company. CTMS management, administration and project implementation as been QA certified by NCS International to AS/NZS ISO 9001:2000, certificate number 8820.


Read Our Capability Statement

Programmed Maintenance

Programmed maintenance means that a scheduled shut down will need to be planned for all cooling equipment once every three months for approximately 4 hours and one every six months for 8 hours. This may vary depending on tower size and location. This schedule has been designed to comply with the requirements of AS3666 Part 2 Operation and Maintenance. Only suitably trained personnel are authorised to carry out these works. This schedule does not cover the application of chemicals into the system for microbial control. A specialist water treatment company should be engaged to carry this out.

Recommended maintenance schedule for Evaporative Cooling Equipment over a 12 month period.

SERVICE EVERY
MONTH
EVERY 3
MONTHS
EVERY 6
MONTHS
EVERY 12
MONTHS
General overall inspection of tower condition      
Drain and clean sump      
Clean sump strainer      
Remove access door and visually inspect inside of casing section      
Remove nozzles and clean all debris      
Remove fill and water blast clean      
Remove eliminators and water blast clean      
Water blast clean the entire tower      
Tighten all loose bolts      
Check and adjust fan belts      
Check motor for noises      
Check bearings for noises      
Grease bearings      
Check unit for vibration      
Check mechanical section for any movement      
Check motor volts and current      
Apply anti-seize to adjusting bolts on motor      
Check tip clearance on fan and adjust if neccessary      
Check pump for leaks and noises      
Check tower bleed rate and advise chemical company if any problems      
Check sump water level and adjust if neccessary. Check valve operation      
Consult with site maintenance engineer if any problems      
Remove spray branches and flush out headers      
Remove and clean air intake louvres